A good specification connects the water analysis, operating schedule and treatment target. Compare quotations against the same assumptions, including feed-water temperature, upstream preparation and what is excluded. If a water report is missing, send the available information and identify it as incomplete.

Project design data

Complete the blank project-value column and share the file with your enquiry. This is a planning worksheet, not an equipment specification.

Parameter / interfaceUnit / formatWhy it matters
Average / maximum daily flowm³/dayProvide both values with the measurement or estimation basis.
Peak hourly inflowm³/h and durationDescribe morning, evening and intermittent discharge peaks.
BOD₅ / COD / TSSmg/LAttach laboratory results with sampling date and location.
Nitrogen / phosphorus / pHmg/L; pHIdentify the parameters required by the project treatment target.
Wastewater temperature / occupancy°C; seasonal profileDescribe cold conditions and periods of low or zero loading.
Effluent target and sampling pointProject requirementAttach the project limits and define how acceptance is measured.
Sludge route / site utilitiesSite plan and responsibilityIdentify disposal access, electrical supply and civil-work boundaries.

Download project data sheet (CSV) ↓

Packaged sewage treatment: define the design basis before choosing a system ↗

What to prepare

  • Average and peak daily flow; operating days
  • Wastewater source, water analysis and seasonal changes
  • Required discharge or reuse target supplied by the project
  • Available space, electrical supply and operator availability
Equipment capacity needs a defined wastewater basis, not only a tank size.

From first brief to a defined scope

  1. Define the influent
  2. Compare treatment routes
  3. Confirm the site interfaces
  4. Prepare the equipment enquiry

Make the scope explicit

Ask the proposal to distinguish equipment supply, civil works, external piping, electrical connections, commissioning, training and consumables. Confirm each responsibility in the project quotation. Items discussed on this website are planning considerations, not an automatic inclusion in every supply package.