
Solar-assisted treatment00345
An integrated domestic sewage treatment option for decentralized sites considering photovoltaic power. Start with the wastewater load and daily energy demand, then define how solar generation, storage and backup supply support treatment operation.
View product ↗ 
MBR systems00344
Biological treatment combined with membrane separation for domestic wastewater projects. Compare this route when the project requires a compact process layout and a defined effluent quality, while allowing for membrane cleaning and operator attention.
View product ↗ 
MBBR systemsBK-SA1402
An integrated biological treatment product in the BOKAWATER MBBR range. Use wastewater analysis and discharge requirements to establish the treatment duty; tank dimensions alone cannot determine the daily treatment capacity.
View product ↗ Questions worth settling early
- Resident population and project duration
- Grid, generator and solar conditions
- Transport, lifting and service access
What to prepare
- Average and peak daily flow; operating days
- Wastewater source, water analysis and seasonal changes
- Required discharge or reuse target supplied by the project
- Available space, electrical supply and operator availability
Make the scope explicit
Ask the proposal to distinguish equipment supply, civil works, external piping, electrical connections, commissioning, training and consumables. Confirm each responsibility in the project quotation. Items discussed on this website are planning considerations, not an automatic inclusion in every supply package.
Equipment capacity needs a defined wastewater basis, not only a tank size.
Discuss your project ↗